School Transport Update – Bishopton from Wednesday 29 May

Roadworks Update: Closure of Erskine Ferry Road, Bishopton, from Mar Hall Drive, eastwards for a distance of 530m.  The closure will be in place on Tuesday, 28th May 2019 till Sunday, 09th June 2019.  This is to allow for carriageway resurfacing works to take place.  Alternative route: Erskine Ferry Road, Bridgeway, Old Greenock Road, Kingston Road, Greenock Road or Vice Versa.  Emergency access will be maintained.

SPT have notified the school this afternoon that they have changed the pick up time for some pupils for the duration of the roadworks will change to ensure pupils arrive on time for the start of the school day. The pick up times at all pick up points on the following contracts will be 10 minutes earlier than normal if pupils affected can be at the pick up point earlier to ensure they are transported to school

Ferry Road contract (Gibson Direct) – all pick up time are 10 minutes earlier than normal – Ferry Road pick up point will be The Co-op during these roadworks

Dargavel contract (Pride of the Clyde) – all pick up times are 10 minutes earlier than normal

India Drive (Gibson) – pick up time is 10 minutes earlier than normal

Keep Reading

PreviousNext